SAP go-lives fail not because of the technology, but because the organization wasn't ready for it. Helix's change management practice ensures that what gets deployed actually gets used — and that adoption translates into measurable operational return.
Research shows that 70% of newly launched transformation projects fall short of their goals, while 27% exceed their budget. The most influential success factors in ERP implementations — as identified by Nah, Lau and Kuang (2001) and Finney and Corbett (2007) — are:
These factors share a common denominator: they all fall within the scope of change management.
Targeted OCM reduces resistance early, minimising re-engineering, rework, and reactive firefighting. Early risk identification and executive sponsorship reduce the need for mid-project corrections — avoiding schedule delays and functional redesign.
Training optimisation and reduced overheadRole-based training and structured knowledge transfer — delivered as part of OCM — ensure users understand the new system and processes from day one. This shortens learning curves and reduces the need for retraining, with studies indicating reductions of up to 30% in overall training time.
Protect your ROI from day oneProactive, readiness-based OCM identifies and addresses go-live risks before they materialise. Organisations avoid prolonged stabilisation periods and reach full operational capacity faster — protecting the expected ROI from day one.
73% of business benefits depend on thisOCM accelerates time-to-adoption, ensuring employees are fully prepared to use the new system at go-live. Target state: active user rate above 80%, workaround rate below 20%. Approximately 73% of expected business benefits depend directly on active user adoption.
Build a culture that embraces changeTransparent communication, structured involvement, and consistent support reduce uncertainty and resistance. Employees who understand the rationale for change are more committed — creating a more stable, predictable transition and a more adaptive organisational culture over time.
Improve morale, loyalty and eNPSThe Helix 5×5 model is a methodological framework that addresses the human, organisational, and leadership factors essential to a successful SAP S/4HANA implementation. It aligns with the SAP Activate methodology, complementing each phase with Helix's practical experience and ensuring that change management is fully integrated into the project — not bolted on.
The model consists of five interconnected process steps covering the entire implementation lifecycle:
Establishing the rationale for change, building organisational commitment, and reducing resistance before the project begins.
Creating a structured, transparent plan that covers communication, training, stakeholder management, and feedback mechanisms.
Seamlessly integrating change management into project execution, ensuring the new operating model becomes an intuitive part of daily operations.
Supporting the development and reinforcement of new structures, processes, and behavioural patterns to ensure lasting results.
Evaluating effectiveness, identifying lessons learned, and refining operational workflows to strengthen organisational resilience for future transformations.
Identifying all project stakeholders, mapping their expectations and influence, and ensuring each key party understands their role and actively supports the change.
Assessing how SAP implementation affects organisational processes, competencies, and roles — and defining targeted intervention points to ensure a smooth transition.
Designing a communication framework that guarantees transparent, consistent, and two-way information flow throughout the project.
Developing internal change ambassadors — key personnel who bridge the project team and the broader workforce, facilitate adoption, provide feedback, and build local commitment.